Revision Release Checklist for Energy Storage Cable Assemblies

Compare the document revisions used for quotation with the revisions proposed for production release. Each file may have its own revision code; this tool compares each file only with its corresponding release copy.

Compare the Controlled Document Set

Controlled documentRevision used for quotationRevision proposed for release
Connection map or assembly drawing
Bill of materials
Wire list
Pinout and connector views
Inspection and test plan
Quotation or commercial scope

Release Result

Enter both revisions for each controlled file.

Release Decision Rules

A mismatch is a change, not an automatic rejection

When a release revision differs from the quotation basis, identify what changed, who approved it, whether price or timing moved, and whether the sample or first-article scope must be repeated.

Matching labels do not prove matching content

Exact revision text is the first screen only. The release owner must still confirm effectivity, approved deviations, component substitutions, drawing views, and the files included in the controlled package.

Resolve Release Mismatches Before Production

Send the revision index and changed files with the project number, quantity, approval authority, and required effectivity.

Request a Release Review