Get in touch with JINYOU Cable Company
-
CALL US +86 181 1623 2461
-
EMAIL sales@jinyougroup.cn
Revision Release Checklist for Energy Storage Cable Assemblies
Compare the document revisions used for quotation with the revisions proposed for production release. Each file may have its own revision code; this tool compares each file only with its corresponding release copy.
Compare the Controlled Document Set
Release Result
Enter both revisions for each controlled file.
Release Decision Rules
A mismatch is a change, not an automatic rejection
When a release revision differs from the quotation basis, identify what changed, who approved it, whether price or timing moved, and whether the sample or first-article scope must be repeated.
Matching labels do not prove matching content
Exact revision text is the first screen only. The release owner must still confirm effectivity, approved deviations, component substitutions, drawing views, and the files included in the controlled package.
Resolve Release Mismatches Before Production
Send the revision index and changed files with the project number, quantity, approval authority, and required effectivity.

