Energy Storage Wiring Harness RFQ Completeness Checker

Mark the inputs already controlled in your enquiry package. The result identifies missing decisions; it does not select a conductor, connector, or protection system.

Check the 12 RFQ Inputs

Select an item only when the governing value or document revision is known.

RFQ Readiness Result

Select the inputs you have, then build the gap list.

How to Use the Result

Ready means documented, not assumed

A high count shows that the enquiry package addresses the 12 decision groups. It does not prove that the values are electrically compatible or that the released revisions agree. Attach the governing files when you request an engineering review.

Open fields become review questions

Send incomplete information when the project is early, but label each open field. JINYOU Cable can then separate quotation assumptions from decisions that must close before sample or production release.

Send the Package for Engineering Review

Include the connection map, BOM, interface references, quantities, target market, and the gap list above.