Jinyou Cable · Shanghai, China

PV Grounding Cable

16, 35 and 95 mm²
450/750 V AC
Copper conductor
PVC insulation

Find a flexible copper PV grounding cable to match a project’s specified earth or bonding circuit. Jinyou Cable will confirm construction, packaging, route conditions and termination inputs before production begins.

Production schedule

10–20 days after specification, packaging and quantity approval

PV Grounding Cable 16-95mm² 450/750V AC

Confirm the Construction Before You Quote

The Jinyou Cable product page documents a flexible BV/BVR earth wire with a copper conductor and PVC insulation. Treating it as a bare copper conductor, a current-carrying photovoltaic cable or a temporary grounding lead creates a specification mismatch risk because those constructions are not interchangeable.

Flexible BV/BVR earth wire with copper conductor and PVC insulation

Electrical identity

  • Rated voltage 450/750 V AC
  • Maximum conductor temp. 70°C
  • Short-circuit temp. 250°C for 5 seconds

Available cross-sections

1×16 mm² 1×35 mm² 1×95 mm²

Fixed installation

  • Minimum bend during installation 5×D
  • Minimum bend after fixing 4×D

D means the documented cable diameter

Product boundary

The voltage and temperature values describe the product page data. They do not establish an outdoor, wet-location, direct-burial, ultraviolet, oil, ozone, salt-mist or chemical rating.

Grounding Scope Checkpoint

A size-only request is the wrong answer when conductor function is undefined because it creates a mismatch risk inside the approved PV array design. IEC 62548-1:2023 places wiring, protection, switching and earthing inside one array-design scope so cable supply follows that design rather than attempting to replace it.

A PV grounding cable is not a substitute for the approved array grounding and bonding design.
01.

Conductor function

Identify equipment grounding, bonding, grounding-electrode or system-grounding duty. Do not use one label for four different circuit functions.

02.

Equipment and drawing

Name the solar panel frame, rack, inverter, enclosure or other equipment, and attach the approved connection drawing.

03.

Required size

State the cross-section from the governing design document. If the drawing uses AWG, provide the original callout instead of assuming that 10 AWG equals an available metric size.

04.

Route and environment

Describe indoor or outdoor routing, conduit, tray, exposure, wet conditions, chemicals, heat and physical protection.

05.

Termination interface

Give the lug or connector range, conductor material, strand requirement, end preparation, mating metal and strain-relief method.

06.

Identification rules

State the destination market and required color, marking and earth-conductor identification from the project document.

07.

Packaging length

Select a documented roll or plastic drum length and identify any reel-label requirement.

08.

Quantity and delivery

Provide total cable length, destination and the required delivery date.

09.

Required documents

List the drawing, inspection record, declaration or other project document that must be reviewed with the quotation.

PV Grounding Cable Scope Verification Diagram

Termination acceptance

OSHA 29 CFR 1910.303 is a useful United States example of the broader connection rule: a terminal must be identified for the conductor material and used without damaging the conductor. The project authority still sets the applicable destination requirements.

ENVIRONMENTAL SPECIFICATIONS

Project Contexts to Qualify

The legacy product page refers to large solar stations, rooftop photovoltaic systems and floating solar arrays. Those project labels are useless without confirmed sunlight, wet-location or corrosion requirements; they define the market context, not the environmental test outcome. IEC 62548-1:2023 places earthing within photovoltaic array design scope, so the project authority must still qualify the route and environment.

Project context Inputs needed before acceptance Reason

Large solar array

Grounding function, route, protective method, approved size and termination drawing

Long routes and distributed equipment make conductor function and physical protection explicit design inputs.

Rooftop PV system

Roof route, conduit or tray, exposure, panel-frame or rack interface and destination rules

A rooftop label does not by itself prove sunlight, heat or wet-location suitability.

Floating solar installation

Humidity, splash or immersion boundary, corrosion class, cable support and metal interfaces

The U.S. Department of Energy notes that improper grounding or fastener selection can reduce bonding reliability in corrosive settings.

Available Cable Sizes and Construction

Use this table to match the design-specified cross-section to the documented Jinyou cable construction. Final conductor sizing remains within the project’s governing electrical design. IEC 62548-1:2023 makes earthing part of the array design scope, so this table identifies available supply options rather than the required project size.

Specification Documented value
Rated voltage 450/750 V AC
Maximum conductor operating temperature 70°C
Maximum short-circuit temperature 250°C for 5 seconds
Minimum bend during installation 5×D
Minimum bend after fixed installation 4×D
1×16 mm² construction 5.04 mm conductor · 1.0 mm insulation · 7.50 mm outer diameter
1×35 mm² construction 6.90 mm conductor · 1.2 mm insulation · 9.30 mm outer diameter
1×95 mm² construction 11.7 mm conductor · 1.6 mm insulation · 14.90 mm outer diameter
Roll packaging 100 m or 200 m
Plastic drum packaging 100 m, 500 m or 1000 m
Jinyou Cable packaging and delivery specification
ORDERING & SPECIFICATIONS

Packaging and Ordering Reference

Pricing varies based on the copper content, cross section, total length, packaging, marking, shipment documentation and any approved custom requirements. Provide project specification and quantity for a written quotation.

Production schedule

Production runs are scheduled at 10–20 days after specification, packaging and quantity approval, confirmed with your quotation.

Documented packaging choices

  • 100 m and 200 m rolls
  • 100 m, 500 m and 1000 m plastic drums
  • Custom marking and packaging requirements reviewed with the order specification

Performance value without invented savings

A complete grounding scope reduces avoidable specification loops by putting the function, size, route, environment, termination and identification rules into one review. No savings percentage, payback period or service-life multiplier is claimed.

Custom Supply and Quality-Control Scope

Jinyou Cable provides OEM review for specifications, function, appearance and products intended for special installation requirements. The service scope covers conductor, material, packaging, storage and transportation controls.

Order controls

CTRL-01

Check the quoted conductor construction and cross-section against the approved requirement.

CTRL-02

Review material and appearance requirements stated in the order.

CTRL-03

Confirm roll or drum length, marking and packing instructions before production.

CTRL-04

Carry the approved storage and transport requirements into the order record.

Documents must be named

List the required product declaration, inspection record or destination document in the inquiry. A quality process does not by itself establish a product certificate, laboratory accreditation or a report supplied with every shipment.

OEM Quality Control and Supply Verification Process

How We Prepare the Order

Interface dimensions are checked before production because a drawing-to-cable mismatch could delay project acceptance and result in rework at the terminals. The connection checks follow the material and use-suitability boundary illustrated by 29 CFR 1910.303; destination rules and project documents govern the final order.

STEP 01

Receive the scope

Send the conductor function, drawing, cross-section, route and destination.

STEP 02

Check product fit

We compare the request with the published construction and available sizes.

STEP 03

Resolve interfaces

Lug range, metal interface, strand requirement, identification and environment are confirmed.

STEP 04

Set packaging

Roll or drum length, labels and quantity are fixed in the order.

STEP 05

Issue the quotation

Product scope, schedule and required documents are written into the commercial offer.

STEP 06

Produce and support

The service team provides a 7×24-hour rapid response for use and installation issues.

Order Preparation Interface and Document Checks

What to attach

  • Single-line diagram or grounding/bonding drawing
  • Cable schedule with metric cross-section or the original AWG callout
  • Lug or connector data and mating-metal details
  • Route, environment, length, packaging and destination requirements
Send the Drawing for Review
Company Profile & Scope

Jinyou Cable Manufacturing for Renewable-Energy Projects

Shanghai Jinyou Jinhong Intelligent Electric Co., Ltd. has operated in Shanghai since 2006. It designs and manufactures cables and integrated electrical products for solar power, energy storage and electric-vehicle applications, exporting to more than 40 countries.

Identity and performance stay separate

These company facts establish supplier identity and manufacturing context. Product suitability still follows the quoted specification, project design and documented acceptance requirements.

Jinyou Cable Manufacturing Facility Equipment
Renewable Energy Cable Production Line
Finished Cable Products and Integrated Electrical Components

Where This Product Needs a Different Specification

This insulated copper wire is not a substitute for every conductor used in a solar grounding system. Use a different specification when the project requirement falls outside the documented construction or another conductor function is required.

Situation Why the current page is insufficient Next action

Outdoor, wet, buried or corrosive route

No matching environmental rating is published for this product.

Provide the exposure class and require the matching evaluated cable construction.

Lightning or surge protection design

A grounding cable does not replace project-level lightning or surge-protection engineering.

Follow the approved protection design and specify the required conductor separately.

Temporary grounding lead

Temporary leads have different flexibility, connection and handling duties.

Specify a purpose-designed temporary grounding assembly.

Unverified copper-to-aluminum interface

A bare copper contact or unsuitable lug can create a material-compatibility problem.

Use a connector identified for both conductor and mating materials.

Send Your Grounding Cable Requirements

Start with the approved cross-section and the nine Grounding Scope Checkpoint inputs. Jinyou Cable will review the product construction, packaging and OEM scope for your quotation.

REQ-01

16, 35 or 95 mm² requirement

REQ-02

Drawing, route and termination details

REQ-03

Package length, quantity and destination

PV Grounding Cable FAQs

Can one grounding cable connect multiple array structures?

That depends on the approved bonding and grounding topology, rack continuity, connection hardware and destination rules. Send the array drawing so the supplied cable follows the design.

Is 10 AWG available?

The published Jinyou sizes are 16, 35 and 95 mm², not 10 AWG. Send the original AWG requirement and the design authority’s conversion or acceptance rule before substitution.

Is this the same as bare copper ground wire?

No. This product is an insulated copper conductor with PVC insulation. Bare copper requires a separate connector, route and metal-interface review.

Can I use it for a DIY solar installation?

The cable must be selected within an approved electrical design and installed by a qualified party under the governing rules. A DIY label does not remove the need to verify grounding function, size, route, protection and termination.

Is the cable rated for direct outdoor sunlight?

No sunlight-resistance or outdoor-use marking is established by the reviewed client source. Submit the route and environmental requirements so the correct evaluated construction can be confirmed.

Which packaging lengths are available?

Documented options are 100 m and 200 m rolls plus 100 m, 500 m and 1000 m plastic drums. State the required package length, labeling and total quantity in the inquiry.

How long does production take?

Production runs are scheduled at 10–20 days after specification, packaging and quantity approval, confirmed with your quotation.

Which files should I send for an OEM quotation?

Send the grounding or bonding drawing, cable schedule, conductor function, required cross-section, route, environmental conditions, lug details, package length, quantity, destination and required documents.