BIPV Route Risk Screen

Mark conditions present on the proposed roof or facade route. The output identifies coordination questions; it is not a cable rating, code determination or design approval.

No route conditions marked

0 coordination flags

Confirm that the drawing actually excludes concealed, penetration, joint, water, bend, exposure, fire and replacement constraints.

    The design team and authority having jurisdiction determine the applicable electrical and building requirements.

    Discuss the Marked Route →